OP-R3 · ROOF SYSTEM

Fully-Enclosed Roof

Fixed enclosed multi-court system with opaque roof membrane and PVC zip-closure lower panels; optional HVAC requires a separate design.

View specifications ↓
OP-R3 Fully-Enclosed RoofReference render; design and engineering subject to confirmation.
01 · APPLICATION

A roof starts with the actual site.

Multi-court venues needing a more sheltered indoor environment.

Application
Multi-court venues needing a more sheltered indoor environment.
Coverage
Roof and full perimeter enclosure
Operation
Fixed
02 · DIFFERENTIATORS

What makes this format different.

01

Complete protection

Roof and perimeter form a full protective envelope.

02

Multi-court format

Intended for two or more courts.

03

HVAC planning

HVAC equipment and ventilation require separate design.

03 · VIEW SPECIFICATIONS

Reference technical specifications.

Fixed enclosed multi-court system with opaque roof membrane and PVC zip-closure lower panels; optional HVAC requires a separate design.

Application
Recommended for two or more courts
Span and length
Matched to site layout
Ridge and eaves height
Project-specific
Roof membrane
Double-sided opaque PVC knife-coated fabric
Side fabric
PVC knife-coated fabric with zipper closure over lower 3 m
Climate control
A/C and ventilation can be specified separately
Hardware
AISI 304 stainless / hot-dip galvanized bolts and chemical anchors
Surface treatment
Zinc-rich powder coating; optional hot-dip galvanizing

Reference technical data, not a structural warranty or safe operating limits. Heights, wind, loads, foundations, anchors, access and permits require project-specific engineering before supply is confirmed.

04 · SITE PLANNING

A roof starts with your site plan.

01

Site and layout

City, court count, dimensions, site drawings and working clearances.

02

Climate and standards

Wind, rain, snow when relevant, foundations and local building rules.

03

Operation and timing

Fixed or moving roof, venue requirements and intended schedule.

05 · FAQ

Before requesting a proposal.

Are the heights and dimensions final?

No. These are supplier references. The site engineer verifies dimensions, loads, clearances, columns and foundations.

What is included in the quote?

KND defines scope for the country, chosen system, dimensions, logistics and installation where applicable. Supplier starting prices are not KND prices.

What details do you need?

City, court count, site plan, dimensions, local weather, enclosure requirements and approximate schedule.

What do wind figures mean for retractable roofs?

They are supplier design targets, not safe operating wind limits or certifications. Safe operation and final capacity require site-specific engineering.

PROJECT PROPOSAL

The right roof is defined around your project.

Share the site, court count, drawings and weather-protection needs. We will review suitability before preparing a project proposal.

WhatsApp