OP-R5 · ROOF SYSTEM

Elevated Retractable Roof

Permanent elevated frame with folding overhead membrane. Starting height 9 m, with project-assessed options up to 15 m and optional side enclosures.

View specifications ↓
OP-R5 Elevated Retractable RoofReference render; design and engineering subject to confirmation.
01 · APPLICATION

A roof starts with the actual site.

Venues requiring open-sky play without moving the supporting frame.

Application
Venues requiring open-sky play without moving the supporting frame.
Coverage
Folding membrane on permanent elevated frame
Operation
Retractable: overhead membrane folds
02 · DIFFERENTIATORS

What makes this format different.

01

Permanent elevated frame

Support stays in place while roof membrane folds.

02

Configurable enclosure

Optional enclosure bands and louvre ventilation.

03

Adjustable height

9 m starting height, subject to study up to 15 m.

03 · VIEW SPECIFICATIONS

Reference technical specifications.

Permanent elevated frame with folding overhead membrane. Starting height 9 m, with project-assessed options up to 15 m and optional side enclosures.

Support system
Permanent elevated frame
Roof operation
Overhead folding membrane
Front membrane
Covers moving upper frame to the track
Enclosures
Independent optional four-sided upper and lower enclosure bands
Ventilation option
Broad horizontal louvres and slim vertical framing
End supports
One central post front and rear if either enclosure band is fitted
Starting height
9 m
Maximum subject to review
15 m
Standard wind design target
62–74 km/h, NOT operating limit
Custom wind design target
150–166 km/h, site engineered, NOT a guarantee
Drive and finish
Project-specific

Reference technical data, not a structural warranty or safe operating limits. Heights, wind, loads, foundations, anchors, access and permits require project-specific engineering before supply is confirmed.

04 · SITE PLANNING

A roof starts with your site plan.

01

Site and layout

City, court count, dimensions, site drawings and working clearances.

02

Climate and standards

Wind, rain, snow when relevant, foundations and local building rules.

03

Operation and timing

Fixed or moving roof, venue requirements and intended schedule.

05 · FAQ

Before requesting a proposal.

Are the heights and dimensions final?

No. These are supplier references. The site engineer verifies dimensions, loads, clearances, columns and foundations.

What is included in the quote?

KND defines scope for the country, chosen system, dimensions, logistics and installation where applicable. Supplier starting prices are not KND prices.

What details do you need?

City, court count, site plan, dimensions, local weather, enclosure requirements and approximate schedule.

What do wind figures mean for retractable roofs?

They are supplier design targets, not safe operating wind limits or certifications. Safe operation and final capacity require site-specific engineering.

PROJECT PROPOSAL

The right roof is defined around your project.

Share the site, court count, drawings and weather-protection needs. We will review suitability before preparing a project proposal.

WhatsApp