Padel court construction: planning the complete build

A reliable installation begins before delivery. Plan civil works, structure, logistics and handover as one project.

Survey the site first

Confirm the usable footprint and delivery access. Ask a qualified local specialist to review ground conditions, levels, drainage and planning obligations. Playing dimensions alone do not describe the space required to install and maintain a court.

Identify interfaces with power, drainage, surrounding fences, outdoor lighting and circulation. A coordinated site layout avoids expensive changes after procurement.

Align civil works and delivery

The slab or foundation, anchoring points and drainage must match the selected court and relevant design loads. A reference drawing is not a substitute for site-specific engineering.

Coordinate manufacturing, transport, unloading and temporary storage. Assign responsibility for lifting equipment and clear space for safe handling of packaged materials.

Assembly and handover

Before opening, record checks of the structure, glass, enclosure, surface, net and lighting. Make sure the installation team has drawings, instructions and support contacts.

Agree on handover documentation and a maintenance schedule. Supply, assembly and locally contracted work should be separated clearly in the scope of work.